Noise Information

In May 2019, the Piedmont Triad Airport Authority resumed work on a phased renovation project on Runway 5R/23L, which is normally the primary runway, closest to the airport terminal building. Aircraft that normally use Runway 5R/23L will be moved to the airport’s parallel runway. This will result in a change in air traffic patterns over the course of this necessary reconstruction project.

Status Report on Runway Closure – August 13, 2019

Font Resize
Contrast
tracking pixel