PTAA is soliciting SOQs to engage the services of a qualified firm to provide Program Management Services for the construction of the PTI Terminal Modernization (TM) project. The TM project is being designed and constructed using a design team and a construction manager at risk (CMAR) and involves the following elements:

  1. Replacement of the existing North and South concourses with a single concourse parallel to the terminal building.
    • When complete, the enplaning level of the new concourse will have fourteen gates and hold rooms supporting the projected fleet mix, multiple food and retail concessions areas, new restroom banks, wellness services, support areas and building systems spaces.
    • The deplaning level of the new concourse will house airline operation areas, central mechanical/electrical/IT rooms, airport operation areas, storage, common loading dock, central trash area, future FIS station and other support functions.
  2. Renovation of the deplaning level of the existing terminal building (approximately 125,000 square feet) to accommodate a centralized baggage claim, TSA bag screening, rental car counters, TSA offices, PTAA offices and storage, PTAA Police Department, conference center, restrooms, and other support functions. This renovation will also require the installation of a fire protection system on this level of the terminal building.
  3. Renovation of the enplaning level of the existing terminal building to accommodate a centralized checkpoint, updated airline ticket counters, concessions, offices, and necessary building spaces.
  4. Other features determined necessary through a collaborative design effort.

The Program Manager selected under this solicitation will operate as an extension of PTAA staff. In this capacity, they will review and provide input on design documents, proposed project costs, overall schedule management for the owner, monitor the activities of the CMAR, inspect work completed and administer the monthly payment procedure between PTAA and CMAR for work complete.

Package Information

  • Version
  • Downloads 405
  • Total File Size 159.09 KB
  • File Count 1
  • Create Date January 22, 2024
  • Last Updated April 12, 2024

Individual File Download(s)

FileAction
Program Management for Terminal Modernization RFQDownload
tracking pixel