The departure (upper) level roadway will be under construction from September through December 2013. The project will consist of patching the roadway and then application of an epoxy sealant. Traffic flow will be minimized to one lane during the construction...
May 8, 2013 – Allegiant Airlines & PTI will be giving away 6 four-packs to the May 26 Coca-Cola 600 Sprint Cup Race. Just submit your caption to the photo above at http://bit.ly/15B63Ad. All entries will be judged based on originality. Entry deadline is 5...